|
Queenhithe Wharf restored
Queenhithe Wharf is restored as part of the improvements to City of London Flood Defences
Client: Systems Geotechnique Limited
|
 |
 |
 |
|
Steel recycled for environmental protection
Canary Wharf cofferdam steel is extracted, remediated and reused in South London Flood Alleviation Scheme
Client: DAWSON-WAM Ltd
|
 |
 |
 |
|
Boscombe Pier rebuilt
The Dorset pierhead is reconstructed using intricately reinforced units precision precast in three dimensions
Client: Macrete Ltd
|
 |
 |
 |
|
Gas pipeline crosses South Wales
Cofferdams near Brecon prepare River Usk Crossing 33 for the 120km Milford Haven to Aberdulais gas pipeline
Client: DAWSON-WAM Ltd
|
 |
 |
 |
|
Protection for World Heritage Site
The Cobb is fortified and Lyme Regis coastline stabilised in an extensive geotechnical operation
Client: Systems Geotechnique Ltd
|
 |
 |
 |
|
City takes a load
Heavy duty static load test set up on Thames side development site alongside London Bridge
Client: PMC Ltd
|
 |
 |
 |
|
More photo captions
Night work for Olympics; West Coast Mainline bridge works; Operations at Gt Ormond St Hospital
Client: Simplex, SGL, Westpile
|
 |
 |
 |